Tabriz metro stations
In 1380, feasibility studies for the Tabriz urban train lines began, and the executive operations for constructing a metro line in Tabriz were implemented in 1381. Five years later, in 2005, the operational plan for designing, building, and implementing additional metro lines in Tabriz, which included four routes, commenced. Currently, Tabriz has five metro lines and a suburban line connecting Tabriz to Sahand City, which is 20 kilometers long. The Tabriz metro has one active line, two lines under construction, two lines under study, and 18 active stations.
Acetech Company is proud to be responsible for the installation contract of 61 escalators for these stations. These escalators are designed for heavy-duty use and high traffic.